AI & GPU servers / Custom systemsSpecify the workload.
CUSTOM / AI & HPC
Specify the workload.
Build the infrastructure.
GPU servers and workstation deployments scoped to your application, power envelope, network fabric, and procurement plan.
OEM platform selected to requirements

SYS-521GE-TNRT reference platform. The OEM photo shows a different GPU population; NexTec’s proposed configuration specifies 8× RTX PRO 6000 Server Edition.
Manufacturer reference imageGPUExact edition & quantity
ECCHost memory design
NVMeBoot, scratch & dataset tiers
Rack-readyDefined integration scope
CONFIGURATION BRIEF
The full system, defined.
Bring an existing bill of materials or a performance requirement. NexTec develops a supported configuration with a defined hardware, software, validation, deployment, and support scope. The gallery shows real example platforms, not a fixed custom-system SKU.
| GPU & host platform | Select the architecture and exact edition first: RTX PRO Server, Workstation or Max-Q; H200 NVL or HGX; or a specified enterprise part number. |
|---|---|
| CPU & memory | AMD EPYC or Intel Xeon server platforms, or a suitable workstation platform. Define CPU cores, memory channels, NUMA layout, capacity and bandwidth. |
| Storage | Separate boot, scratch, model and dataset storage. Specify usable capacity, enterprise drive endurance, resiliency, and shared storage throughput. |
| Networking | Management, storage, application and cluster fabrics. Identify port count, Ethernet or InfiniBand, optics, cabling and switch compatibility. |
| Power & cooling | Set GPU caps, sustained full-system load, power redundancy, rack density and airflow or liquid-loop requirements together. |
| Software & deployment | OS, firmware, drivers, CUDA, containers, scheduler, licensing, remote management, rack integration and workload handoff as agreed. |
| Procurement & lifecycle | Itemized BOM, acceptable substitutions, order releases, serial tracking, warranty and replacement process, and forecast-based repeat purchases. |
Custom compatibility and performance depend on the final qualified bill of materials. A configuration proposal precedes any order or delivery commitment.
